The operational requirements are as follows

  • This is an ongoing operation that moves from 150,000.00 up to 220,000.00 Mts per month of magnetite iron ore.
  • Receiving and stockpiling of bulk cargo using dump trucks
  • The XRF analysis of cargo being received, to ensure the delivered cargo meets the required specifications.
  • Co-ordinating with the railways.
  • Loading of cargo into rail wagons, using SABS approved load cells. (to eliminate overweight penalties)
  • Our Phalaborwa team is able to load a 4600mts train in under 6 hours. This includes tarping and documentation ,and is setting the standard in Phalaborwa.